There were a lot of changes since the last time I had been down. Plumbing and electrical rough in was partially complete, some HVAC work was underway, all of the interior framing was done. Windows and doors were all in.
Kitchen-to-be |
The most significant difference though was the outside. Roofing was on. Siding was mostly done. From the outside, it looked almost done, as compared to the inside which looks nowhere near done.
River facing facade |
I really like the style and color of siding we picked, and the roofing looks great too.
Exciting stuff.